Siemens SINAMICS G120 modular inverter advantages
Published:2023-08-18 15:49:06
1. Modular design creates a high degree of flexibility to adapt to future requirements for drive solutions
The control unit can be replaced with power (hot swap)
Use plug terminals
The procedure for replacing the device is simple and easy to maintain
2. Safety features are integrated, so the cost of integrating the drive into the machinery or equipment with safety solutions is significantly reduced
3. Support PROFINET or PROFIBUS communication based on PROFIdrive Profile 4.0
Plant wide engineering design can be realized
Easy to handle
4. With innovative loop design (two-way input rectifier and "reduced capacity" DC bus), the kinetic energy of the load can be returned to the power supply system when using the power module PM250. Because of the feedback capability, there is no need to convert regenerative energy to heat through the brake resistance, resulting in a significant reduction in energy consumption.
5. Integrated USB interface, making local debugging and diagnosis easier
6. Integrated features for pump, fan and compressor applications, such as:
4 freely programmable PID controllers
Application-specific wizard
Equipped with Pt1000/LG-Ni1000 temperature sensor interface
AC 230 V relay
3 freely programmable digital timing switches
7. With CU250S-2 control unit: Integrated positioning function (basic locator EPos) can realize positioning tasks with high dynamic characteristics during operation. Positioning can be achieved by incremental encoders or/and ** value encoders (SSI)
-
202212-29
Test method for Delta Circuit breakers AC contactors and frequency converters
1. Circuit breakerThe circuit breaker is a device that can be operated manually or automatically. It is used to control the on-off of the system power supply in the circuit system of the device. When ···
-
202303-24
How does the WEINVIEW touch screen connect with the Omron NJ controller?
First, Omron NJ controller programming1. Create the structure data type required by the project. For example, the Boolean switch quantity used in this example is combined to establish a structure data···
-
202303-17
Installation guide for Siemens S7--200 equipment
The S7-200 can be mounted on a panel or standard guide rail. The S7-200 can be mounted horizontally or vertically.warningSIMATIC S7-200 PLC is an open controller. It requires the S7-200 to be installe···
-
202301-31
Influence of Delta impulse current on frequency converter
In the process of maintenance of frequency converter, it is found that due to the back electromotive force in the stator winding, the electromotive force in the motor under the condition of synchronou···
-
202212-29
Schneider instrument maintenance precautions
1. When installing and adjusting the appearance, the original status should be recorded in order to recover.2, repair the appearance of fine instruments, such as accidentally small parts flying, shoul···