Installation and commissioning steps of ABB robot accessories
Published:2023-01-17 16:59:22
General steps for ABB robot installation and commissioning:
1. Lift the robot body and control cabinet into place
2. Cable connection between ABB robot body and control cabinet
3. ABB robot teaching device is connected with control cabinet
4. Connect to the main power supply
5, check the main power supply is normal, power on
6. Calibration operation of mechanical origin of six axes of the robot
7. Setting of 1/0 signal
8. Install tools and peripheral equipment
9. Programming and debugging
10. Put into automatic operation
Basic debugging methods/steps of abb robot accessories
1. System information Displays the relevant information of the controller and the operating system. You can view the version and option of RobotWare currently in use, the current key of the control and driver module, and the network connection.
2. The robot system needs to be restarted under the following circumstances:
1) New hardware has been installed.
2) The configuration parameters of the robot system are changed.
3) System failure (SYSFAIL)
4) The RAPID program has a program fault.
Matters needing attention
ABB robotic systems can be unmanned for long periods of time. There is no need to periodically restart a running system.

-
202212-29Test method for Delta Circuit breakers AC contactors and frequency converters
1. Circuit breakerThe circuit breaker is a device that can be operated manually or automatically. It is used to control the on-off of the system power supply in the circuit system of the device. When ···
-
202302-24WEINVIEW touch screen common faults and maintenance
(1) The startup indicator is normal, but the display shows no signal input (black screen);(2) Press the on key, the host does not have any response (the indicator light is not bright, the host startup···
-
202212-29Mitsubishi plc and computer communication setting method
Open the Mitsubishi plc programming software, menu "Online" -- >" transmission Settings "inside to select your connection method.1, first Mitsubishi plc and computer connection ···
-
202302-08Reduce Schneider inverter interference measures
(1) Inductance and capacitance are added on the input side of Schneider inverter to form LC filtering network.(2) The power line of Schneider inverter is directly supplied from the transformer side.(3···
-
202308-18Siemens SINAMICS G120 modular inverter advantages
1. Modular design creates a high degree of flexibility to adapt to future requirements for drive solutionsThe control unit can be replaced with power (hot swap)Use plug terminalsThe procedure for repl···



+8618621383628
+8613811814778
info@zhongpingtech.com
Building 26, Liyuan Community, Chaoyang District, Beijing, China