Working principle and application of Omron relay
Published:2023-01-13 16:39:02
Working principle
When a certain voltage is added to both ends of the coil, a certain current will flow through the coil, resulting in electromagnetic effect. Under the action of electromagnetic force attraction, the armature will overcome the tension of the return spring and draw towards the core, thus driving the armature's moving contact and static contact (normally open contact) to draw.
When the coil is powered off, the electromagnetic suction also disappears, and the armature will return to its original position in the spring's reaction force, so that the moving contact and the original static contact (normally closed contact) release. This suction, release, so as to achieve the purpose of conduction in the circuit, cut off.
For the "normally open, normally closed" contact of the relay, can be distinguished in this way: the relay coil is not energized when the static contact is disconnected, called "normally open contact"; A static contact in the switched state is called a "normally closed contact".
use
1. Expand the control range: for example, when the control signal of the multi-contact relay reaches a certain value, it can change, break and connect the multi-circuit at the same time according to the different forms of the contact group.
2. Amplification: For example, sensitive relay, intermediate relay, etc., with a very small control amount, can control a large power circuit.
3. Integrated signal: For example, when multiple control signals are input into multi-winding relays in the prescribed form, the predetermined control effect can be achieved through comparative synthesis.
4. Automatic, remote control, monitoring: for example, the relay on the automatic device, together with other electrical appliances, can form a program control line, so as to achieve automatic operation.

-
202302-13Mitsubishi PLC communication detection steps
When you are ready to communicate through the AJ71QE71, perform the ping procedure in MS-DOS mode before starting the communication with Mitsubishi PLC's GPPW to see if the connection is correct. ···
-
202302-20This section describes how to set the bios of Advantech mainboard
1. Set the system date and timeOn the standard BIOS setting screen, press arrow keys to move the cursor to Date and Time, and then press Page Up/Page Down or +/&S722 to correct the date and time o···
-
202302-28Omron plc maintenance procedures and equipment regular cleaning regulations
I. Maintenance procedures, regular equipment testing and adjustment regulations(1) Check the connection of wiring terminals in the PLC cabinet every half a year or quarter. If loose places are found, ···
-
202512-25Introducing ESTUN S-Eco & S-Pro Series Collaborative Robots: Redefining Flexible Production
In the evolving landscape of industrial automation,the demand for smarter,safer,and more efficient robotic solutions has never been higher.Addressing this need head-on,the ESTUN S-Eco&S-Pro Series···
-
202303-24How does the WEINVIEW touch screen connect with the Omron NJ controller?
First, Omron NJ controller programming1. Create the structure data type required by the project. For example, the Boolean switch quantity used in this example is combined to establish a structure data···

+86 13811814778
+86 13811814778
Building 26, Liyuan Community, Chaoyang District, Beijing, China