How to choose Omron relay
Published:2023-01-13 16:47:15
1, select the rated working current of electromagnetic relay coil: DC electromagnetic relay driven by transistor or integrated circuit, the rated working current of the coil (generally 2 times of the suction current) should be within the output current range of the driving circuit.
2. Select the contact type and contact load of electromagnetic relay: the same type of relay usually has a variety of contact forms for selection (electromagnetic relay has: single group contact, double group contact, multi-group contact and normally open contact, normally closed contact, etc.), should choose the contact type suitable for application circuit.
3. Select electromagnetic relay coil power supply voltage: When selecting electromagnetic relay, the first thing to choose is whether the relay coil power supply voltage is AC or DC. Generally, the rated working voltage of a relay should be less than or equal to the operating voltage of its control circuit.
4, choose the appropriate volume of electromagnetic relay: the size of the Omron relay volume is usually related to the size of the Omron relay contact load. The size of the relay should be selected according to the requirements of the application circuit.

-
202302-02Mitsubishi inverter overload fault judgment method
1. Check whether the three-phase power of the motor is balanced(1) If the three-phase voltage of the motor is not balanced, the three-phase voltage of the output end of the Mitsubishi inverter should ···
-
202309-07YOULI Multiway valve - Multiway valve regulation method
1. Under normal conditions, before the hydraulic multiway valve leaves the factory, its opening pressure should be adjusted one by one to the setting value required by the user. If the user puts forwa···
-
202212-29Schneider small circuit breaker and leakage switch difference
1. Definition of mini circuit breakerElectrical occupation for short MCB, suitable for communication 50/60Hz extra voltage 230/400V, extra current to 63A line overload and short circuit maintenance, a···
-
202303-24How does the WEINVIEW touch screen connect with the Omron NJ controller?
First, Omron NJ controller programming1. Create the structure data type required by the project. For example, the Boolean switch quantity used in this example is combined to establish a structure data···
-
202302-08Reduce Schneider inverter interference measures
(1) Inductance and capacitance are added on the input side of Schneider inverter to form LC filtering network.(2) The power line of Schneider inverter is directly supplied from the transformer side.(3···



+8618621383628
+8613811814778
info@zhongpingtech.com
Building 26, Liyuan Community, Chaoyang District, Beijing, China