Omron plc maintenance procedures and equipment regular cleaning regulations
Published:2023-02-28 16:01:38
I. Maintenance procedures, regular equipment testing and adjustment regulations
(1) Check the connection of wiring terminals in the PLC cabinet every half a year or quarter. If loose places are found, re-connect firmly in time;
(2) Measure the working voltage of the power supply to the host in the cabinet every month.
Ii. Provisions for regular cleaning of equipment
(1) Clean PLC every six months or quarter, cut off the power supply to PLC, remove the power rack, CPU motherboard and input/output board in turn, purge, clean and then install in place, restore all connections and power and start the PLC host. Carefully clean the PLC box health;
(2) Replace the filter under the power rack every three months.

-
202301-16TPC1262HI Common faults of MCGS on-state touch screen
TPC1262HI Common faults of MCGS touch screen(1) Black screen, flower screen and white screen(2) LCD screen aging, low high pressure, lamp aging(3) The LCD screen has no display, and the brightness is ···
-
202301-06Schneider isolation switch operation essentials
Schneider barrier switch features: First of all, Schneider barrier switch can be used to block the power supply, it can disconnect live equipment and high voltage maintenance equipment, but also can s···
-
202304-14Delta inverter to reduce the failure rate method
Daily check Item 1 of Delta Frequency converter problem repair:Check whether the sound of the motor is abnormal during operation, including whether the motor is vibrating during operation.Daily view o···
-
202302-07How do I set the IP address of the touch screen
How to set the IP address when the touch screen is in useFor example: CMT2109X2 and CMT2079XFirst - > Click the little yellow button on the touch screenNext - > Click the lock symbolAgain - >···
-
202212-29The composition of the configuration software of Kunlun MCGS embedded version
The user system generated by MCGS embedded version is composed of five parts: main control window, device window, user window, real-time database and operation strategy.1, the main control window: the···

+86 13811814778
+86 13811814778
Building 26, Liyuan Community, Chaoyang District, Beijing, China